Schedule of Rates & Tariffs

Parish Water Company
Baton Rouge, Louisiana
Issued: June 15, 2023

 

Monthly Minimum Charge

Size of Meter

  • 5/8" - $13.81
  • 3/4" - 25.48
  • 1" - 40.49
  • 1 ½" - 78.86
  • 2" - 130.57
  • 3" - 259.00
  • 4" - 443.20
  • 6" - 908.00
  • 8" - 1940.64

The minimum charge applicable to meter banks (two or more meters on one service line) shall be that which would be billed under the above schedule for a single meter having nearest equivalent capacity.

Monthly Rates for Water Used Per 100 Cubic Feet

  • First 3 hundred cu. ft. - $4.602
  • Next 197 hundred cu. ft. - 1.668
  • Additional hundred cu. ft. - 1.120

 

Private Fire Protection

Automatic Sprinkler System

Size of Service Monthly Charge

  • 2" - $19.50
  • 3" - 28.50
  • 4" - 36.00
  • 6" - 46.50
  • 8" - 60.00

Private Fire Hydrant Service

Per year payable monthly in advance $300.00

Temporary Meters

*Installation & Removal of Meter on Hydrant - $350.00

Deposit - $1,000

Water used: $6.00 per 1,000 gallons

*If meter is installed on service other than hydrant,

installation and removal will be at cost.

Effective: January 5, 2021

Authority: Docket u-35092

Service Charges and Fees

  • For each new service connected to the Company's system, the initial service charge will be $300.00.
  • Temporary and special service will be furnished at prevailing rates plus the actual cost of installing and removing the service and necessary attendance.
  • For turning on a service or reading the meter upon a change of customers, the charge will be $30.00.
  • For reconnecting a service after disconnection for non-payment, failure to make a deposit, or fraudulent use, the charge will be $50.00.
  • For reconnecting a service after business hours and on weekends after disconnection for non-payment, failure to make a deposit, or fraudulent use, the charge will be $100.00.
  • For the customer taking water without applying for service and ignoring notices to apply for service, necessitating the locking removal of the meter, the charge will be $50.00.
  • For the customer turning the service on after an off-for-nonpayment necessitating the removal of the meter, the charge will be $50.00.
  • For the customer taking water through the use of a jumper device or a stolen meter, the charge shall be $35.00 or actual cost not to exceed $250.00.
  • For each check given to the Company by the customer and charged back to the Company by the bank for nonsufficient funds i.e., NSF, the charge per occurrence will be $20.00.
  • A deposit of $5.00 will be required for a meter test requested by the customer. If the meter records in excess of 102% of the quantity measured, the deposit will be refunded. Otherwise, the amount of the deposit will be retained as a charge for the meter test.
  • For the customer paying their bill by credit card, an additional convenience fee will be assessed for each transaction. This fee will be the actual fee charged by the 3rd party processor.
  • For the customer paying their bill by credit card, and disputed or charged back to the company, an additional fee will be assessed. This fee will be the actual fee charged by the 3rd party processor.

 

interior image schedule-rates tariffs